logo
Racklify LogoJoin for Free
Login

Implementing Batch and Wave Picking: Systems and Layouts

Batch and Wave Picking

Updated September 2, 2025

Definition

Implementation of Batch and Wave Picking requires coordinated WMS functionality, intelligent batching and wave rules, optimized facility layout, and appropriate hardware to maximize throughput and accuracy.

Overview

Overview


Implementing Batch and Wave Picking successfully demands coordinated planning across software, people, and physical systems. The technical implementation focuses on batching algorithms, wave scheduling logic, warehouse layout, material-handling equipment, and integration with Warehouse Management Systems (WMS). This guide walks beginners through the concrete steps and considerations to deploy batch and wave strategies effectively.


1. Define Objectives and Constraints


Start by identifying your primary goals: increase pick rates, meet carrier cutoffs, reduce labor costs, or improve order accuracy. List constraints such as dock schedules, pack station capacity, labor shifts, and SKU velocity. Clear objectives guide batching and wave sizing decisions.


2. Configure WMS and Software Capabilities


The WMS is central. Key capabilities to enable for batch and wave picking include:


  • Batching engines that group orders by SKU commonality, pick density, zone, or priority.
  • Wave planning modules that schedule release windows based on shipping cutoffs, resource availability, or SLA priorities.
  • Real-time visibility of order status across picking, packing, and staging.
  • Integration with labor management systems for workforce forecasting and assignment.


Ensure your WMS supports flexible rules: fixed batch sizes, maximum tour distance, SKU constraints (e.g., cold chain SKUs separate), and priority overrides for rush orders.


3. Design Physical Layout and Slotting


Warehouse layout should minimize travel for high-frequency picks. Key layout considerations:


  • Slot fast-moving SKUs in forward-picked areas accessible to batch pickers.
  • Zone picking compatibility: group SKUs by zones if using zone-based batch/wave flows.
  • Allocate dedicated consolidation or sortation areas near packing stations to reduce handoffs.


Effective slotting reduces the number of discrete locations a picker must visit during a batch pick tour.


4. Determine Batching Strategy and Rules


Batches can be formed by different logic: SKU affinity (common items), order similarity (same destination), pick density (minimizing travel), or simply fixed time windows. Practical batching rules include:


  • Max lines or units per batch to prevent overloading sortation or pack stations.
  • Excluding fragile or temperature-controlled SKUs from general batches.
  • Combining slow-moving items with fast movers only if packing and consolidation systems can handle variability.


Use historical order data to model different batch sizes and predict picker workload and sorter throughput.


5. Configure Wave Scheduling


Waves should align with external and internal constraints: carrier cutoffs, truck loading windows, or staffing shifts. Wave parameters often include start time, expected work volume, priority rules, and resource reservations. Common approaches:


  • Time-based waves: fixed intervals (e.g., hourly) for steady throughput.
  • Event-based waves: triggered by reaching a threshold of orders or entering a cut-off window.
  • Priority waves: dedicated waves for high-priority or expedited orders.


Simulate waves under different conditions to balance picker workload and pack-station capacity.


6. Select Hardware and Automation


Pick tools and automation that match your chosen strategy: handheld scanners and RF guns for flexible batch picking; pick-to-light or voice systems for hands-free picking in high-accuracy environments; conveyors and sorters to handle the post-batch sortation workload; automated guided vehicles (AGVs) or carts to move batches to consolidation zones.

Automation choice depends on volume, SKU variety, and capital availability. For many operations, starting with RF-guided batch picking and a manual sort lane is cost-effective.


7. Workforce Planning and Training


Batch and wave systems change picker workflows. Provide training that covers:


  • How batches are created and how to interpret combined pick lists.
  • Sorting rules at consolidation points and error-handling procedures.
  • Wave schedules, priorities, and expected performance metrics.


Cross-train staff to flex between picking, sorting, and packing in peak times for better resiliency.


8. KPIs, Monitoring, and Continuous Tuning


Track KPIs continuously: pick rate, order cycle time, on-time shipping, pack-station utilization, and error rates. Use WMS dashboards and historical analyses to tune batch sizes, wave frequency, and staffing. Run controlled A/B experiments: change only one variable (e.g., batch size) and measure the impact on throughput and errors before wide roll-out.


9. Pilot and Scale


Begin with a pilot in a single zone or for a subset of SKUs. Validate assumptions: are batches arriving at pack stations at expected rates? Are waves matching carrier schedules without creating congestion? After validating, scale gradually across zones and refine rules based on real-world data.


Example Implementation Timeline


Week 1–2: Define objectives, gather historical order data, and map constraints.

Week 3–4: Configure WMS batching and wave rules; design layout changes and slotting.

Week 5–6: Pilot hardware (scanners, carts), train staff, and run small-scale pilot.

Week 7–8: Analyze KPIs, adjust rules, and scale to additional zones.

Ongoing: Continuous tuning and seasonal adjustments.


Conclusion



Implementing Batch and Wave Picking is a systems exercise: software, layout, hardware, and people must be aligned. For beginners, start small, rely on your WMS capabilities, and iterate using measured KPIs. With the right configuration, batch and wave strategies significantly increase throughput while keeping orders aligned to shipping commitments.

Tags
Batch and Wave Picking
WMS
warehouse layout
Related Terms

No related terms available