Kit Work Order vs Production Work Order: When To Use Each
Kit Work Order
Definition
An instruction authorizing a specified quantity of kits to be assembled according to a defined configuration.
Overview
Kit Work Order An instruction authorizing a specified quantity of kits to be assembled according to a defined configuration. Comparing it with a production work order clarifies when a warehouse should use kitting rules versus full production routing and manufacturing controls.
At a glance, a kit work order organizes discrete components into a packaged set for sale or downstream assembly. A production work order (often used in manufacturing) controls a multi-step transformation process where components are processed, altered, or combined using machines or labor to make new parts. The two overlap, but they serve different operational needs and controls.
Key Differences
- Objective: Kit work orders assemble existing finished goods or components into a configuration for shipment; production work orders create or transform materials into new items.
- Routing And Steps: Kit work orders emphasize picking and packing steps; production work orders include machine operations, setup, run times, and yield metrics.
- Inventory Accounting: Kitting typically consumes component inventory and increases finished kit inventory at 1:1; production may consume raw materials and record scrap, byproducts, or produced quantities variably.
- Quality Controls: Production orders usually require process controls, in-process inspection, and traceability to batch/lots; kit orders focus on content verification and packing standards.
When To Use A Kit Work Order
Use a kit work order when the assembly requires little to no conversion of components and primarily needs picking, counting, and packing. Typical scenarios include promotional bundles, starter kits, subscription boxes, spare parts packs, and pre-configured product bundles shipped directly to customers or channel partners.
When To Use A Production Work Order
Use a production work order when components are physically transformed (cutting, molding, soldering), when machine setup and run time determine costs, or when yields, process parameters, and inspection records must be tracked (e.g., PCB assembly, injection molding, metal fabrication).
Operational Impacts
- System Requirements: Production orders often require MRP/ERP manufacturing modules with capacity planning; kit work orders can be handled within core WMS/BOPIS workflows.
- Labor Skills: Kits usually need packers and pickers; production requires trained operators and maintenance support.
- Throughput Planning: Kitting can be scheduled around peaks using batching and waves; production needs detailed routing times and possibly changeover planning.
Hybrid Approaches
Some operations blend the two: a production work order produces a subassembly that then becomes a component in a kit work order. Example: A furniture maker produces a pre-assembled leg module (production order) which is later combined with tabletop and hardware in a kit work order for final shipment.
Choosing The Right Control And Documentation
- Traceability Needs: If you must trace parts to final kits for recalls or warranty, ensure work orders capture lot/serial numbers at the point of assembly.
- Costing: Use production orders when you need to capture labor and machine costs precisely; use kit orders when the emphasis is inventory consumption and packaging costs.
- System Integration: Align the type of work order with your WMS/ERP capabilities to avoid manual reconciliations and data gaps.
Practical Example
Case: A consumer electronics company sells a headphone bundle. If the bundle is simply headphones, a cable, and a carrying case combined for retail, issue a kit work order and use the WMS for batch picking and packing. If the company needs to attach serial-numbered firmware updates to each headphone prior to packaging, that firmware step is a production-like process and may require a production work order or a hybrid process that logs the transformation then issues a kit work order for packing.
In short, the Kit Work Order is best when items are combined without material transformation and speed, accuracy, and inventory control are the priorities. Use production work orders when processing, yields, and manufacturing control are required; combine both where operations cross over.
Sources And Additional Reading (4)
- Fundamentals of Manufacturing and Material Requirements Planning
“Fundamentals of Manufacturing and Material Requirements Planning.” ASCM, https://www.ascm.org/.
- Warehouse Management Systems (WMS) Explained
“Warehouse Management Systems (WMS) Explained.” MHI, https://www.mhi.org/fundamentals.
- Inventory Management and Kitting Best Practices
“Inventory Management and Kitting Best Practices.” GS1 US, https://www.gs1us.org/.
- Warehousing Best Practices
“Warehousing Best Practices.” WERC, https://www.werc.org/.
More from this term
Looking for a 3PL?
Compare warehouses on Racklify and find the right logistics partner for your business.